Gangway Roller Kit for 10′ PE GANGWAY
In stock · Ships in 1–2 business days
$310.00
For most floating dock systems
This roller kit allows the PE gangway to roll back and forth when the water height changes. Attaches to the t-nuts embedded into the gangway. Mounting hardware included.
What you can expect.
Ships fast.
Most orders leave our Hudson, NH warehouse within 1 business day. Northeast addresses typically arrive in 1–2 days.
Built for the Northeast.
Commercial-grade hardware designed for winter storage and four-season water — shipping nationwide.
Real humans answer.
Dock specialists on the phone M–F 8a–5p and Saturday mornings. Never a chatbot.




